What a studio gallery integration costs and what moves the price

Why one number is hard to give

People often ask what a gallery integration costs and expect a single figure. I understand the wish, but two galleries that both look like a desk with a wall of monitors can differ by a factor of three in the work behind them. A small interview room with a compact mixer and a handful of sources is a different job from a news gallery that has to switch twenty feeds, talk to a dozen people on intercom and survive a failed power supply during transmission.

What we can do is explain the pieces that make up a quote, so you can see where your own project sits. Studio Equipment Integration covers specifying the kit, installing it, wiring it, and commissioning it so that every part works as one system. Each of those stages carries labour, and the amount of labour depends on choices you make early on.

Specification: where the money is first decided

The most influential decision is how many sources the gallery must handle and how they get there. Counting cameras is not enough. Remote contributors, playout, graphics, a caption machine and a spare feed for emergencies all need inputs, and every input needs a path through routing to the mixer and the monitors. More paths mean more hardware, more cable and more hours of testing.

The second decision is the level of redundancy. A single power supply and one signal route is cheaper to build and simpler to understand. A second route, a spare mixer output and duplicated power add cost, but they decide whether a fault becomes a short pause or a blank screen. We ask what a minute of lost output means to you before recommending either approach.

  • Number of cameras, remote feeds and playout sources
  • Size of the monitor wall and number of operator positions
  • Level of backup power and signal routing
  • Whether existing equipment is being reused

Equipment you choose and equipment you already own

Hardware is the part of the price people see most clearly, yet it is rarely the largest driver of the final figure. A vision mixer, a routing matrix and an intercom system each come in ranges, and we will specify a level that fits the programme you actually make rather than the biggest unit that fits the budget. Choosing a mid-range mixer with room to grow often serves a regional news operation better than a flagship unit it will never fully use.

Reusing what you own can lower the bill, but only if it is in sound condition and speaks the same signal formats as the new equipment. We inspect older gear before we agree to build around it. Sometimes an old monitor or patch bay earns its place; sometimes it adds hours of conversion and troubleshooting that cost more than a replacement would have.

Cabling, racks and the room itself

Wiring is where a gallery either becomes dependable or becomes a puzzle. Good cable work is slow: labelled runs, sensible lengths, separated power and signal, and a rack laid out so that a technician can trace a fault at two in the morning. That time appears in the quote as installation labour, and I would not want to see it trimmed.

The room matters as well. A purpose-built gallery with cable routes already in the floor is quicker than a converted storeroom where every run must be drilled and fixed. Ventilation for the racks, the height of the monitor wall and the distance between gallery and studio floor all change the amount of cable, containment and fixing we have to supply and fit.

Where the gallery sits on an upper floor or behind a listed wall, access alone can add a day.

Commissioning, training and the days after

Installation ends when the last cable is connected, but the job does not. Commissioning means testing every source to every destination, checking tally and intercom, simulating failures and confirming that the gallery behaves as agreed. Callum, our lead broadcast engineer, does this on site, and it takes as long as the system is complicated.

Handover is the other cost people forget. Your operators need to know the desk, and your engineers need a written record of how the system is wired. We provide a signal diagram and a short walk-through. If you want longer training sessions or a standby visit during your first live shows, we price those separately so you pay only for what you ask for.

  • Source-to-destination testing and failure simulation
  • Written signal diagram and labelled documentation
  • Operator walk-through on the finished gallery

What to prepare so the quote is firm

The more precise your brief, the firmer our figure. A list of the programmes you make, how many people work in the gallery, which sources you need, and any equipment you intend to keep lets us write a quotation with few assumptions. We also like a photograph or plan of the room, even a rough one.

If you cannot answer everything yet, that is fine. We can site visit and measure, then give a quote that states clearly what it assumes. Ordering follows a simple route: you send an enquiry through the contact page, we reply with a written quotation, and once you confirm we invoice for payment by bank transfer. Nothing is committed until you agree in writing.

The price of a gallery integration follows the complexity of what you ask the system to do, the resilience you want, and the state of the room and equipment we start from. None of that is mysterious once it is written down. If you tell us what you broadcast and what failure would cost you, we can give a quotation that accounts for each part and leaves no surprises later.

About the author

Helen Marsden

Founder and Head of Production

Helen has directed live studio programmes for more than twenty years and leads project planning at jurnizo.